For almost every house in Berkshire and Surrey, the answer is no. Air source heat pumps are permitted development in England, which means you can install one without a planning application, a committee decision, or a fee. What trips people up is that the rules changed substantially in 2025, so a good share of the advice still circulating online describes restrictions that no longer exist.
The detail matters, though, because the exceptions cluster in exactly the kind of property this area is full of: conservation-area streets, listed buildings, and tight semi-detached plots. Here is how the rules actually work in 2026.
Permitted development rights are the set of works the government has decided are minor enough that they do not need individual planning approval. Air source heat pumps sit inside that set, under conditions that the vast majority of domestic installations meet comfortably: one unit on a semi-detached or terraced house and up to two on a detached house, an outdoor unit no bigger than 1.5 cubic metres, sited within the published limits, and not used solely for cooling.
If your home is a standard house, not a flat, not listed, and the unit can be sited sensibly, there is no application to make. Nobody at the council reviews it, and there is no approval to wait for. The compliance work that does exist is a sound calculation your installer completes before fitting, rather than an application to the council, which is a distinction worth understanding because it changes who carries the responsibility.
In practice, this is why a properly run heat pump project starts with a survey rather than paperwork. Siting, noise, and compliance are design questions.
Planning Checked as Part of Your Design
Planning is one of the things we settle inside the survey.
“Adam also ensured the grant application, planning and certification were all dealt with and left behind a comprehensive data pack at the end of the job. After almost 2 months of operation the new system is working as intended with Adam fielding any questions I might have.”
Stephen Saunders, Google Review
Until 2025, the most commonly quoted restriction was the 1-metre rule: the outdoor unit had to sit at least 1 metre from your property boundary to qualify as permitted development. On a typical Berkshire semi with a side return or a narrow passage between houses, that single condition forced awkward siting decisions and occasionally pushed projects into full planning applications.
England removed that restriction on 29 May 2025. The same amendment raised the outdoor unit size limit for houses from 0.6 to 1.5 cubic metres and allowed a second heat pump on a detached house, which matters for larger properties that need more capacity. If you researched heat pumps two years ago and concluded your plot made permitted development impossible, that conclusion is probably out of date. The current conditions are published on the Planning Portal, and they are considerably more permissive than most older guides suggest.
The noise requirement stayed, and that is the piece that actually protects your neighbours. It now follows a new standard, MCS 020(a), which sets the limit at 37 dB(A) for the heat pump alone.
| Rule | Before May 2025 | Since May 2025 |
|---|---|---|
| Distance from the boundary | At least 1 metre | Removed in England |
| Outdoor unit size | 0.6 cubic metres | 1.5 cubic metres on a house (still 0.6 on a block of flats) |
| Noise calculation | MCS 020, 42 dB(A) including background noise | MCS 020(a), 37 dB(A) from the heat pump alone |
Every permitted development heat pump installation must pass an MCS planning assessment before it goes in. The core of it is a noise calculation: the unit, in the position proposed, must not exceed 37 dB(A) at a point one metre outside the nearest window or door of a habitable room in a neighbouring home. The assessment accounts for the unit’s sound data, the distance, and any barriers between the unit and that window.
37 dB(A)
The most noise the unit may make one metre outside your neighbour’s nearest habitable-room window or door, checked in the MCS 020(a) sound calculation before it goes in.
Two things follow from this. First, the boundary rule becoming history does not mean units can be placed carelessly; the noise calculation still disciplines siting, just more intelligently than a blanket distance did. Second, this is not homework for you. The assessment is the installer’s job, and any competent air source heat pump installation company runs it as a standard part of the survey. If an installer quotes you without mentioning siting or the MCS assessment, that tells you something about the rest of their process.
We covered what heat pump noise actually sounds like, and what makes the difference between a quiet install and an annoying one, in our guide to heat pump noise.
Where the Outdoor Unit Can Go
If your plot is tight or your neighbours are close, the siting assessment is exactly what the survey is for.
“We were fitting a heat pump as part of a ground floor renovation. Adam was great at working around the project, putting pipework in while ceilings were down, liaising with builder and being flexible with dates.”
Lucy Grainger, Google Review
Berkshire and Surrey have an unusual concentration of both, so this section is less of an edge case here than nationally. This is especially relevant to heat pump planning rules in conservation villages like Chobham.
Conservation areas: permitted development still applies, with extra conditions about where the unit can go, mainly to keep equipment away from the street scene. The law keeps the unit off any wall or roof that faces a road, and no nearer to a road than the house itself. In practice that usually means the rear, or a side elevation that does not face a road. For the conservation streets of towns like Sunningdale, Cookham, or Henley, this is a solvable design constraint rather than a blocker, and it is one we deal with routinely on heat pump installations in Sunningdale and similar areas.
Listed buildings: this is the genuine exception. Permitted development for air source heat pumps does not apply on a listed building or anywhere within its curtilage, so the installation needs a planning application. Where the unit, its fixings or its pipe runs affect the building’s special character, listed building consent is needed as well, and the two are usually submitted together. Well-designed proposals with sympathetic siting can be approved, but it is a formal process with drawings and lead time, and it should be planned into the project schedule from the start.
Permitted development still applies, with extra conditions on where the unit goes.
Needs planning permission, because permitted development does not apply, plus listed building consent where the work affects the building.
If your home is older but not listed, the planning question is usually the easy part; the design question is what matters, and we covered that in will a heat pump work in my older home.
A small set of situations falls outside permitted development:
Flats and maisonettes have narrower rights than houses. Permitted development allows only one air source heat pump on a whole block of flats, with an outdoor unit no bigger than 0.6 cubic metres, so once the block has one, or the unit is larger, you need a full planning application, and freeholder consent in any case.
Non-compliant siting, where the only viable position for the unit fails a PD condition or the noise calculation, means the project either gets redesigned or goes through a householder planning application.
Additional units beyond what PD allows for your property type can also require an application.
Where a house needs an application, it is a householder application (a flat needs a full planning application): drawings, a noise report, and a decision normally due within eight weeks. It is paperwork, not a battle, and approval rates for well-prepared heat pump applications are high. But in our experience across Berkshire and Surrey, the overwhelming majority of houses never get near this stage.
Usually no. For most houses in England, an air source heat pump is permitted development, provided the installation meets the standard conditions and passes the MCS planning assessment. Flats and listed buildings are the main exceptions.
It was the old requirement for the outdoor unit to sit at least 1 metre from the property boundary. England removed it in May 2025. Siting is now governed by the MCS noise assessment instead, which is a more sensible test of whether a position actually works.
Usually yes. Permitted development applies in conservation areas with additional siting conditions, generally keeping the unit off elevations that face the street. Rear positions normally satisfy this, and side positions do too unless that side faces a road, as on a corner plot.
Yes. Permitted development does not cover a listed building or its grounds, so you need planning permission, plus listed building consent where the unit or its pipework affects the building’s character. Sympathetic proposals can be approved, but it adds a formal step and lead time to the project.
Under permitted development there is no consultation stage to object into. The protection neighbours rely on is the MCS 020(a) limit of 37 dB(A) one metre outside their nearest habitable-room window or door, which is calculated before installation. A neighbour can still report noise to the council as a possible statutory nuisance, which is one more reason to site the unit with care.
Your installer. It is part of the survey and design work on any properly run project, and the documentation sits with the rest of your compliance paperwork at handover.
Heat pump planning permission is a question with a boring answer for most Berkshire and Surrey homeowners: you do not need it. The rules moved in your favour in 2025, the one surviving requirement is the installer’s job, and the genuine exceptions, flats and listed buildings, are identifiable in the first five minutes of a survey. What deserves your attention instead is whether the system is designed properly, because that, not the planning system, is what decides whether the house is warm and the bills behave.
The survey settles siting, the MCS assessment, and any conservation nuance for your specific property, and you see the full design.
Eco Renewables are trusted by homeowners throughout Berkshire and the South East to provide high-quality heat pump heating system installations.
If you're considering a heat pump, the survey is where it starts. We assess the property, run the heat loss calculations, and tell you exactly what the system would look like.
Get My Free Heat Pump Blueprint