A heat pump in a poorly insulated house can keep the house warm, provided the design starts from the heat that house loses today. We wrote this for two kinds of Berkshire and Surrey owner: a 1960s to 1980s detached or semi on a Wokingham, Bracknell or Crowthorne estate with a thin loft and its first glazing, or a solid-wall Victorian or Edwardian house in Reading, Windsor or Guildford, mid-renovation.
Both houses can take a heat pump; the open question is what to change first. Adam Dare, who designs our systems, fits the heat pump once a house is close to finished, since later windows or insulation change the heat loss the design was sized to. The Blueprint shows that heat loss as the house stands, and his walkthrough covers whether fabric work or the heat pump comes first.
In most cases it will. A heat pump can heat a draughty house with thin insulation once the design works from the house’s real heat loss, and the poor insulation shows up as cost: a bigger outdoor unit, bigger radiators in the coldest rooms and higher running costs than the same house would have once insulated.
The design works from the heat the house loses today.
Needed in the coldest rooms of a leaky house.
The same house costs less to run once insulated.
If you claim the Boiler Upgrade Scheme grant, its 2026 amendment regulations require the heat pump to have enough capacity to meet the property’s full space heating demand on its own, so a leaky house needs a heat pump big enough to carry it alone. We run the same room-by-room sums for every air source heat pump installation we take on, grant or no grant.
Insulation is rarely a condition of installation, a point the heat pumps in older homes guide covers for period and listed properties. With poor insulation, the useful question is which fabric jobs to do before the design, the approach the Energy Saving Trust calls fabric first.
In an uninsulated home the walls lose the biggest share of the heat, by Energy Saving Trust figures, and warm air escaping through gaps in floors, walls and lofts puts draught-proofing on the list too. The table sets each job against the mess it makes and its place in the order of works.
| Fabric job | What the Energy Saving Trust says | Disruption | Order with a heat pump |
|---|---|---|---|
| Loft insulation | About a quarter of the heat leaves through the roof | Low: laid between and over the joists | Before the heat loss survey |
| Cavity wall insulation | About a third leaves through the walls | Low: injected through holes drilled outside | Before the survey, after a suitability check |
| Draught-proofing | Heat also escapes as warm air through gaps | Low: gaps sealed at floorboards, floor edges, pipes and the loft hatch | Before the survey |
| Floor insulation | The ground floor can account for 10% to 20% | Medium to high: boards lifted or a new floor laid | Before the design |
| Solid wall insulation | About a third leaves through the walls | High: boards inside or a finished layer outside | Decided before the design |
The heat loss survey turns each of those losses into a watt figure, room by room, and our page on what a heat loss survey measures sets out how. Adam then goes through the numbers with you and says which fabric jobs are worth doing first. We design and fit the heat pump, and we advise on the fabric work around it.
See Your Heat Loss Room by Room
The Blueprint puts a heat loss figure on every room in your house, so you can see where the heat goes before you spend on windows or insulation.
“Adam has also been available for follow up and support.”
Gerard Barron, Google Review
The design is a snapshot of the house on survey day. Put in double glazing two years later and the heat loss drops while the outdoor unit stays the same size, leaving a system bigger than the house needs. That is why Adam fits the heat pump once the house is close to finished, and our guide to how a heat pump is sized explains why the match matters.
List the glazing, loft, wall and floor work you plan for the next few years.
Have that fabric work done before anyone measures the house.
Book the heat loss survey and Blueprint once the new windows and insulation are in.
Fit the heat pump, cylinder and radiators, then commission them against the Blueprint.
A kitchen refit or redecorating can wait until after the heat pump, because neither touches the walls, roof, floors or windows the design is worked from.
A renovation gives a heat pump its easiest route into a house. Pipework can run while ceilings and floors are open, the builder and the installer can plan the cylinder cupboard together, and the fabric work the design depends on is already on the programme.
Fabric work fitted around the same time as low carbon heating
Double or triple glazing
39%
Floor insulation
33%
Solid wall insulation
25%
Source: Boiler Upgrade Scheme interim evaluation, 2025
Pairing the jobs shows up in government data. In the 2025 interim evaluation of the Boiler Upgrade Scheme, 39% of surveyed grant recipients said they had double or triple glazing fitted around the same time as their low carbon heating, 33% floor insulation and 25% solid wall insulation.
Plan the Heat Pump Into Your Build
Book the Blueprint while the renovation is still on paper, and the unit size, cylinder spot and radiator list can sit in the builder’s plans before the ceilings close.
“We were fitting a heat pump as part of a ground floor renovation. Adam was great at working around the project, putting pipework in while ceilings were down, liaising with builder and being flexible with dates.”
Lucy Grainger, Google Review
For a heat pump, a solid wall house works on the same sums, but its walls have no cavity to fill. Energy Saving Trust guidance gives two routes: boards or a filled stud wall inside, or an insulated layer fixed outside and finished in render, brick slips or tiles. Each is a building project in its own right, so the wall decision comes first. Signs that fabric work should lead:
Signs your house needs fabric work before a heat pump
Ticking one of these does not rule a heat pump out. It sets the order: fabric work first, then a unit sized to the improved house.
Find Out Whether Fabric Comes First
In Adam’s walkthrough of your Blueprint, you find out if your walls, loft or draughts need work before a heat pump goes in, or if the house can take one as it stands.
“I can’t believe how efficient the heat pump is considering our house is 300 years old.”
Paul-john Andrews, Google Review
Wokingham, Bracknell and Crowthorne estates from the 1960s to the 1980s went up with cavity walls and lofts insulated to the standards of their day, and some of their detached and semi-detached houses still have their original glazing.
Reading’s Market Place and London Street, Windsor Town Centre and Guildford Town Centre are all conservation areas, and there the 2015 General Permitted Development Order takes cladding a house in stone, render, timber, plastic or tiles outside permitted development. So external wall insulation finished in render on a house in those streets needs planning permission, while internal boards leave the outside untouched.
Planning permission
Needed for render-finished external wall insulation in conservation areas such as Windsor Town Centre, which the 2015 General Permitted Development Order leaves outside permitted development.
Cookham’s High Street cottages and Victorian villas bring the two questions together: solid walls, and for some of them a conservation area. Our page on heat pump installation in Cookham covers how we design for them.
It can be done, with the heat pump sized to the full heat loss of the house as it stands. The outdoor unit gets bigger, more radiators need upgrading and the running costs rise, so an empty loft or cavity is worth filling first.
Yes. New glazing lowers the heat lost through every window it replaces, so a heat pump designed before the windows go in ends up larger than the finished house needs. If new windows are planned within a few years, fit them before the heat loss survey.
Not as a condition of installation, and a heat pump can be designed around unfilled cavity walls. With about a third of an uninsulated home’s heat leaving through the walls, by Energy Saving Trust figures, filling a suitable cavity first lets the design work to a smaller number.
No. The rule that an EPC must show no outstanding loft or cavity insulation recommendations was dropped in May 2024, and since 28 April 2026 you no longer need an EPC to apply. The £7,500 air source grant in England and Wales keeps its other conditions, such as owning the property and replacing heating that runs on gas, oil, LPG or electricity.
That depends on how much heat your walls lose against the loft, floors and windows, which the heat loss survey measures room by room. Internal boards take a little depth off each room; external insulation changes the look of the house, and in a conservation area a render, timber or tile finish needs planning permission.
Yes, once the draughts are counted in the design. In a 1970s Bracknell semi or a Victorian terrace in Reading, warm air lost through gaps adds to the heat loss the heat pump must cover, so sealing floorboards, floor edges and the loft hatch before the survey shrinks the figure.
Your Heat Pump Blueprint lists the heat loss of every room, the unit size, the radiator schedule and the design flow temperature. The heat loss survey behind it carries a fee, refunded in full if we go on to fit the heat pump.
Book the Blueprint before you commit to new windows, wall insulation or a heat pump.
Eco Renewables are trusted by homeowners throughout Berkshire and the South East to provide high-quality heat pump heating system installations.
If you're considering a heat pump, the survey is where it starts. We assess the property, run the heat loss calculations, and tell you exactly what the system would look like.
Get My Free Heat Pump Blueprint