How Long Does It Take to Install a Heat Pump? The Heat Pump Installation Process in Berkshire and Surrey Homes
By Adam Dare
Heat Geek trained installer
Updated 24 November 2026
Reading time
🎉 Named South East Heating Installer of the Year 2026
The heat pump installation process in a lived-in home across Berkshire and Surrey runs from a first estimate to a handover walkthrough, and the work on site takes 2 to 4 days on a typical job. This guide is for families and home workers who stay in the house that week and want to know when the heating goes off and what to move before the van arrives.
The length of your week is set at the design stage, before anyone lifts a floorboard. The room-by-room design decides how many radiators change, and a long radiator list or a larger house can push a job past four days.
You get the timeline for your house in writing before work starts, and on a typical job it fits inside the range below.
2 to 4 days
Time on site for a typical heat pump installation. A larger house or a long radiator list adds days.
A renovation stretches it further, because pipe runs wait for ceilings and floors to come up. Our air source heat pump installation page lays out the four stages of the job, and the week on site sits inside stage three.
The first step happens at a desk. You send us details of the house and its heating, and we come back with an estimate and a view on whether a heat pump suits it. The site visit follows, a heat loss survey that carries a fee, refunded in full if you go ahead. Our guide to what happens at the heat loss survey covers the visit itself.
Next comes a video call where Adam shows you the design, with the flow temperature and each room’s target temperature on screen. The information pack we bring to the survey visit is yours to keep. That design becomes your Heat Pump Blueprint: heat loss worked out room by room, the radiator schedule, the cylinder size and spot, and the scope under one fixed price.
| Stage | What you get |
|---|---|
| First estimate | An estimate and a view on whether a heat pump suits the house |
| Heat loss survey | An information pack to keep, and a fee refunded in full if you go ahead |
| Design video call | Adam shows the flow temperature and each room’s target temperature |
| Heat Pump Blueprint | Room-by-room heat loss, radiator schedule, cylinder size and spot, one fixed price |
Once you sign off the design, we book the install with that scope and a timeline. The schedule lists and prices any radiator that falls short, so a radiator swap cannot turn up halfway through the week as an extra.
See Your Install Plan Before Booking
Your Blueprint lists the radiators that change and where the cylinder goes, so you know what the install week involves before anything is booked.
“From initial contact through final hand-over Adam was attentive and punctual.”
Stephen Saunders, Google Review
The order below is typical. On your job Adam sets the sequence in the timeline, and some stages overlap. We cover floors and carpets before the first tool comes out, and we clear up every room before we go home.
Outdoor unit and base
We set the unit on a concrete base with anti-vibration feet, its back to the wall, where the survey placed it.
Two pipes, one sealed hole
Insulated flow and return pipes run from the unit into the house through a single sealed sleeve in the wall.
Cylinder in, old boiler out
We fit the hot water cylinder the hot water plan specifies and take out the old boiler.
Radiator swaps
Any radiator the schedule lists as short at the design flow temperature gives way to a larger one, and the others stay.
Electrics and controls
An isolator and power feed go in for the outdoor unit, and the controls and room thermostats get wired up.
Fill, flush and commission
Once everything is connected, we fill and flush the system, check the joints for leaks and set the flow temperature to the design.
Radiator work is the stage that varies most between houses, because the schedule might list one radiator or ten. Our guide on which radiators may need changing explains how the survey decides.
Know Which Radiators Change First
The Blueprint’s radiator schedule names every radiator that stays and every one that changes, so you know how big stage four is in your house.
“We moved out while Adam spent a week fitting the heat pump and upgrading radiators and felt very happy leaving him in the house to do everything he needed to do.”
Lucy Grainger, Google Review
Your heating and hot water go off for part of the week, because we have to drain the old system before we connect and fill the new pipework and heat pump. How long they stay off depends on how much of the system changes, so ask for the changeover day when you get the timeline.
Where the outdoor unit and the outside pipe run can go in first, the old boiler keeps the house warm until the changeover. Expect the mains water and the power to some circuits to go off for short spells too, while we connect the cylinder and the new electrics.
Off for part of the week, while we drain the old system and fill the new one.
Off for short spells, while we connect the cylinder and the new electrics.
Keeps the house warm until the changeover, where the outdoor unit and outside pipe run can go in first.
If you work from home, keep a plug-in heater ready for the home office. With young children in the house, plan bath time on the changeover day at a relative’s or a neighbour’s.
Commissioning puts your design figures into the controls: flow temperature, weather compensation curve and cylinder reheat times, and we check the system against them. At handover we go through running it in winter and on a smart tariff, and you keep a written operating guide.
Set at commissioning, covered at handover
Every installation includes 12 months of full support and the first annual service, alongside our 5-year workmanship guarantee and the insurance-backed deposit and 2-year workmanship cover. Our guide to what happens after the install covers handover day, the first weeks and the first winter.
Your Commissioning Figures, Written Down First
The flow temperature we commission to sits in your Blueprint from the start, so handover checks the system against a number you have already seen.
“I was able to leave Adam the keys and he and his team worked diligently and quickly to get the work done and leave the property in good order. Adam has also been available for follow up and support.”
Gerard Barron, Google Review
In a 1960s to 1980s detached house in Wokingham or Bracknell that runs on a combi, the hot water plan often puts the new cylinder in the airing cupboard or the loft. A Victorian or Edwardian house in a town centre such as Reading or Windsor tends to have tighter cupboards and on-street parking, so settle the cylinder spot and where the van goes at the survey.
What to clear before day one
The same week runs outside the two counties too. In Amersham, where inter-war Metro-land houses sit up the hill from the listed Old Town, our page on heat pump installation in Amersham shows how we design for both.
Two to four days on site is typical, and larger properties or long radiator lists can take longer. Over those days the air source heat pump installation process runs from the outdoor unit and its base to commissioning, and the timeline for your house comes in writing before work starts.
Yes. On a typical job you stay in the house throughout, and we cover floors and carpets and clear up at the end of every day. Moving out makes sense when the install falls inside a bigger renovation, as it did for one of our Google reviewers.
For part of the week, yes. Heating and hot water stay off from the point we drain the old system until the new one is filled and running, and the gap grows with the pipework and radiators that change. Ask us to mark the changeover day on your timeline.
On the first day we cover floors and carpets and go through the plan with you before any tool comes out. Which stage starts that day follows the timeline set for your house, so ask which jobs fall on day one when we send it.
Only in planned places. The flow and return pipes need one sealed hole through an outside wall, and floorboards come up where new pipework runs to a swapped radiator or the cylinder. The Blueprint fixes the pipe routes and the scope before work starts, so the boards that come up are agreed in advance.
Across Berkshire and Surrey the typical range is the same 2 to 4 days, and the house decides where a job lands within it. A 1960s to 1980s detached house in Wokingham with few radiator changes sits toward the lower figure, and a large period house with a long radiator schedule can run past four.
Your Heat Pump Blueprint sets one fixed price against a written scope, radiator by radiator, so you can plan the week around your own house before you commit.
Eco Renewables are trusted by homeowners throughout Berkshire and the South East to provide high-quality heat pump heating system installations.
If you're considering a heat pump, the survey is where it starts. We assess the property, run the heat loss calculations, and tell you exactly what the system would look like.